The timetable of the project
| Begin of phase | End of phase | Phase name |
| 01.07.2024 | 30.06.2028 | Data acquisition |
| 01.07.2024 | 30.06.2028 | Coordination and dissemination |
| 01.10.2024 | 30.09.2028 | Detection of runoff changes |
| 01.01.2025 | 31.12.2027 | Rainfall-runoff modelling |
| 01.01.2025 | 31.12.2027 | Hybrid simulation framework |
| 01.01.2025 | 31.03.2028 | Case studies |